Team/Area Section Owner ⬅️ Updates Since Last Meeting ➡️Upcoming Plans
🐈 FilOz @Anonymous • nv29 support
• Lotus no longer using proofs.filecoin.io (but rather ChainSafe Infra)
• Various things in FOC, but I haven’t been close to the details recently. We can give more recap next meeting. • nv29 calibration upgrade
• Lotus 1.37.0 RC and final release for nv29
🌳 Forest [email protected] • NV29 support
• extended external dataset tests to mainnet
• evm tooling
🪚ChainSafe Infra [email protected] • proof params hosting on https://filecoin-proofs.chainsafe.dev/
🌞 Venus [email protected]
🤔 Curio [email protected] completed the Easy-PDP epic: 1-liner runs 100% of the software to have a PDP SP administered via web: https://medium.com/@filoz/become-a-filecoin-onchain-cloud-storage-provider-in-five-minutes-57abbcd95876
StorSwift (lotus-miner, Boost) nv29 support for lotus-miner and Boost.
⚖️ Governance [email protected] NV29 Timelines: https://github.com/filecoin-project/core-devs/discussions/221
🔐 FF Security [email protected] 1. Ramping up solstice AI security testing once final branches are decided.
  1. Reworking red team agent for seamless onboarding. | |

Sync Agenda & Notes

Add agenda items here

Item Current (as of 2026-09-22) Dates Note
✅ Actor code freeze 2026-09-16 Requirements:

This happens at least one day after the actor code freeze because the new actor bundle needs to be “packed” into Lotus (docs). | | Calibnet upgrade date | 2026-09-24 | Requirement:

Usually this is a minimum +1 week after Lotus RC. We are shrinking the window for this upgrade given we are giving the 4 key calibration SPs advance notice that the upgrade is coming. (discussion thread with calibnet sps) We also need to make sure key infra providers also update in time (RPC providers, bootstrappers) | | Final Lotus release | [week of] 2026-09-28 (e.g., 2026-10-01)

| Can happen after a verified successful Calibnet upgrade. We know verification will take longer this time (at least a week) because of wanting to observe behavior after various "quarters" per the being-drafted test plan.

Note: there is concern that a week of testing in calibration may not be enough. We do have some fudge (can add a couple of days), but the next step is finishing the testing plan so we can assess the size. | | nv29 mainnet upgrade date | ~2nd half of October | • Usually there is a minimum of +2 weeks after Final Lotus release. • China Golden week is October 1-7. This means Chinese SP’s will have less than 2 weeks or working time to perform upgrades. • October 12 is a US holiday (Columbus day, Indigenous People’s day) • Filecoin’s 6th birthday is October 15. |

AI Meeting Notes

Solstice (NV29) Status

Upgrade Timeline